Skip to main content

Service · Occupied workplaces

Workplace performance, cooling & energy.

For organisations in Abuja, Lagos and across Nigeria whose offices are uncomfortable, costly to cool or due a phased renovation. We assess how the workplace is cooled, used and run, then scope the improvements that matter first.

Who it is for

When the workplace is working against the people in it.

  • Hot and cold complaints

    Some desks are too warm, meeting rooms too cold, and nobody can say why the same system produces both.

  • Costly or unreliable cooling

    Cooling runs long hours, bills or generator use feel high, and outages or repeat maintenance calls disrupt work.

  • Phased, occupied renovation

    Teams must keep working while layouts change, so improvements need sequencing around people, not an empty floor.

This builds on our workplace audit, design coordination, fit-out and post-occupancy work: Outtabox coordinates the assessment, design and retrofit, with engineering and HVAC work carried out by qualified appointed specialists under the agreed scope.

Occupied open-plan workstations and lockers at the Roche Abuja workplace
Roche Abuja workplace, delivered by Outtabox.

Method

Assess. Improve. Verify.

Three stages, each with a defined output, so decisions are made on evidence rather than assumption.

  1. 01

    Assess

    A scoped review of the occupied workplace and its records.

    • Comfort and cooling condition as experienced on the floor
    • Cooling zones compared with current occupancy and layout
    • Bills, run-hours, outages and maintenance baseline
    • Agreed non-intrusive measurements
  2. 02

    Improve

    A prioritised improvement scope, then separately quoted coordinated design or retrofit.

    • Layout and energy-efficiency opportunities
    • Prioritised findings and next-step scope
    • Coordinated design and retrofit with qualified MEP specialists
    • Phasing around people who keep working
  3. 03

    Verify

    Checks that what was agreed is what was handed over.

    • Commissioning and handover records from responsible specialists
    • Post-occupancy review against the agreed scope
    • Defects and improvement record

Starter package

Workplace Performance Check, from ₦600,000

For one site and one floor up to 500 m². It covers a visual and records review plus agreed non-intrusive measurements, and ends with prioritised findings and a next step scope.

What you receive

  • Visual walkthrough of the occupied floor
  • Review of available bills, run-hours, outage and maintenance records
  • Agreed non-intrusive measurements
  • Prioritised findings report
  • Next-step scope for design, retrofit or monitoring, if needed
Request a written quotation

Terms in brief

  • Access, specialist availability and the final measurement scope are confirmed in a written quotation.
  • Payment is 80% at booking and 20% at report handover, subject to written terms.
  • Larger floors or multiple floors and sites are quoted individually.
  • This is a separate professional engagement. Where identical assessment work is already included in an existing Outtabox design or strategy contract, it is not charged again.

Not included in the starter fee

  • Applicable taxes
  • Specialist tests beyond the agreed scope
  • Travel outside the agreed area
  • Equipment
  • Implementation and retrofit works
  • Software or monitoring licences

Delivery

Clear scope. Accountable delivery.

  • Coordinated, specialist-led engineering

    Outtabox coordinates the workplace assessment, design and retrofit. Engineering measurements, design and HVAC interventions are carried out by qualified appointed MEP and commissioning specialists under the agreed scope.

  • Evidence before performance commitments

    Any savings or performance improvement depends on the measured baseline and the agreed scope, so we establish the evidence first rather than quote fixed savings, payback periods or uptime.

  • Separately scoped next steps

    Full design, detailed engineering and bills of quantities, retrofit delivery and any monitoring are scoped and quoted separately, on our existing design and delivery terms.

  • Workplaces and critical IT environments

    Outtabox leads the occupied workplace. Critical IT rooms and data-centre power and cooling integration are delivered by Africore under its own scope, so a combined project has a clearly allocated specialist for each part.

FAQs

Questions buyers ask first.

Enterprise enquiry

Discuss an upcoming workplace project

Share the outline of your requirement and we will respond with a considered view on scope, sequence and how we would run the project.

Discuss a project